top of page
Palace House, London
Modernisation of a 6 floor goods passenger lift within an occupied international language college.
The “back to guides” modernisation included replacing all the major lift components and bringing the lift up to the most modern standards where practical. The specification called for a heavy duty door solution so we installed Wittur Pegasus doors on the car and landings including a higher rated stainless steel for the one external entrance.
The project experienced supply chain issues which were handled professionally and the customer and consultant kept up to date at all times.
bottom of page