One Welbeck Healthcare
Location: 1 Welbeck Healthcare, Marylebone, London, W1G 0AR
Status: Complete
Lift: Triplex Modernisation
SCOPE OF WORKS:
Modernise 3 x Existing Conventional MRL Lifts
Improve reliability and install open protocol control system
Upgrade doors with a more robust equivalent
Add trimmer steels to shared shaft and install shaft division screens
EQUIPMENT USED:
Ziehl Abegg Gearless motors
Selcom Pegasus landing doors and car door operators
New Lift control panels
Dewhurst Push Buttons
Bespoke high end lift interior
Triplex Modernisation
Features
Travel
12M
Stops
5
Speed
1.0MS
Weight
630KG
-
The installation of this triplex was especially challenging due to the building being a live private hospital
-
The works were completed post COVID and testing had to be completed everyday and documented in the site diary
-
This was a very busy building which also had film crews on certain floors, so all noisy works had to be planned in advance
-
All working areas were fully protected and hoarded to avoid unnecessary damage
-
As part of the scope of works, one lift had to be fully firefighting compliant with separate entrances on adjacent landings