4 Coleman Street
Location: 4 Coleman Street, London, EC2R 5AR
Status: Complete
Lift: Duplex Triplex Hall Call Destination Modernisation
SCOPE OF WORKS:
Replace 1 x Existing Lifts with a fully compliant firefighters lifts
Modernise 3 x existing passenger lifts and upgrading to include hall call destination control
EQUIPMENT USED:
Ziehl Abegg Gearless motors
Selcom Pegasus landing doors and car door operators
Newlift control system with destino function
Dewhurst Push Buttons
Triplex Modernisation
Features
Travel
31M
Stops
9
Speed
1.6MS
Weight
630KG
-
The installation of the firefighters lift was especially challenging due to this being notifiable to the city of London and spot checks had been made in order to confirm that the lift and all associated equipment all complied with current regulations
-
All working areas were fully protected and hoarded to avoid unnecessary damage
-
Prior to removal of the existing lifts, the project team installed completely fire rated hoardings over every entrance
-
The triplex modernisation involved installing landing touch screens on every landing and also landing ID flags, these all complied with current standards and was the first install for Target Lifts using the New Lift Destino package with remote monitoring