top of page
IMG_4620.DNG

Thames Enterprise Centre

Location:  Gloucester Road, South Kensington, London, SW7 4RA
Status: Completed
Lift:  MRL Lift

SCOPE OF WORKS:

Replacement of the below

Full strip-out of existing lift system.

Installation of a new MRL lift within the pre-existing shaft.

Integration of a new Remdale lift structure.

 

EQUIPMENT USED:

LiftBox – Complete lift package

NewLift – Controller system

Wittur Pegasus Hydra – Landing entrances and door gear, selected for their durability and smooth operation

 

IMG_8473.jpg
IMG_8472.jpg
IMG_8470.jpg

MRL
Lift

 

Features

Travel 

Existing 

Stops

5

Speed

0.63MS

Weight

400KG

  • Target Lifts was appointed to modernise the lift installation at the Thames Enterprise Centre. The project involved the complete removal of the ageing lift system and the installation of a new, efficient MRL (Machine Room‑Less) lift within the existing shaft. This upgrade enhances reliability, energy efficiency, and user experience for all building occupants.

  • Challenges & Solutions - Incorrect Remdale Structure. During installation, it was identified that the supplied Remdale structure did not fit the shaft as required. Solution: New steelwork was manufactured to correct the structural dimensions, allowing installation to proceed without compromising safety or performance.

  • Water Ingress in Lift Shaft. Water entered the existing lift shaft during periods of rain, posing a risk to equipment and installation timelines. Solution: The site’s builders were deployed to resolve the ingress issue, ensuring the shaft remained dry and suitable for lift installation.

 

Working with