4 Coleman Street | Target Lifts
top of page
BP_TargetLifts-112.JPG

4 Coleman Street

Location:  4 Coleman Street, London, EC2R 5AR
Status: Complete
Lift: Duplex Triplex Hall Call Destination Modernisation

SCOPE OF WORKS:

 

Replace 1 x Existing Lifts with a fully compliant firefighters lifts 

Modernise 3 x existing passenger lifts and upgrading to include hall call destination control

EQUIPMENT USED:

 

Ziehl Abegg Gearless motors

Selcom Pegasus landing doors and car door operators

Newlift control system with destino function 

Dewhurst Push Buttons

BP_TargetLifts-114.JPG
BP_TargetLifts-118.JPG
BP_TargetLifts-116.JPG

Triplex Modernisation

Features

Travel 

31M

Stops

9

Speed

1.6MS

Weight

630KG

  • The installation of the firefighters lift was especially challenging due to this being notifiable to the city of London and spot checks had been made in order to confirm that the lift and all associated equipment all complied with current regulations

  • All working areas were fully protected and hoarded to avoid unnecessary damage

  • Prior to removal of the existing lifts, the project team installed completely fire rated hoardings over every entrance

  • The triplex modernisation involved installing landing touch screens on every landing and also landing ID flags, these all complied with current standards and was the first install for Target Lifts using the New Lift Destino package with remote monitoring

Working with
the best. 

logo-black_edited.png
bottom of page